News Flash

Home

Posted on: March 14, 2019

2019 Spring Load Restrictions

double-1665066_1920.jpg

2019 Spring road restrictions for all Township roads goes into effect on Friday, March 15, 2019 at 12:01 am.

The ending dates for Spring road restrictions are based on how weather is affecting roadway strength. These dates are established by monitoring roadway strength as weather conditions change. Therefore, the ending dates for Spring road restrictions are variable. The Township follows the dates for seasonal road restrictions determined by the Minnesota Department of Transportation (MnDOT). As soon as a date is set, MnDOT will report this date on its 24-hour automated message center at 651-366-5400 or toll free at 800-723-6543. The Township will also post updates when they come available.

MnDOT Seasonal Load Limits
Facebook Twitter Email

Other News in Home

Hazardous waste picture

April Mobile HHW Collection Site

Posted on: April 2, 2019
A water hydrant shooting a stream of water onto the street.

Hydrant Flushing to Begin

Posted on: April 2, 2019
trash to treasure

Trash to Treasure Day

Posted on: April 2, 2019
Fema Flooding

Increased Flooding Risk

Posted on: March 12, 2019